Login

Lost your password?
Don't have an account? Sign Up

Bolloré Logistics Pakistan handled oversized shipment

Share This News Story:

KARACHI : Bolloré Logistics Pakistan’s Industrial Projects Teams carried out a shipment for a leading construction machinery and equipment company.

The shipment consisted of Out of Gauge Generators & ISO Tanks supplied by Allied Engineering Pvt Ltd based in Karachi and to be moved to CFR Equatorial Guinea.

The project was secured by joint efforts of Bolloré Logistics team in UAE & Pakistan. The 83 sets of Generators & ISO Tanks with accessories required multiple Flat Racks, High Cubes & standard containers which were secured and seamlessly loaded. The operation required lots of planning, coordination and discussions with the carrier regarding vessel booking and timely placement of Flat Rack containers from the client’s factory to Port of loading in Karachi.

A pre shipment survey was also arranged by the team in Pakistan to ensure smooth execution of operations during the loading and transfer process to ensure successful execution well within the timelines.

A new project that adds to the many already successfully completed and managed by the team in Pakistan.

Share This News Story: