Login

Lost your password?
Don't have an account? Sign Up

JNPA announces Electrical Ferry Boat from JNPA to Mumbai to start operation in January 2025

Share This News Story:

MUMBAI : The project aims at bringing a zero-emission environment-friendly ferry boat for the public. The new pollution-free and environment-friendly electric ferry Boat, backed by Harit Sagar or the “Green Port” initiative, focuses on sustainable port operations and reducing the environmental impact launched by the Ministry of Ports, Shipping and Waterways. It aims to achieve net zero emissions by 2047 and enhance renewable energy usage by 60% across major ports.

The electrical ferry Boat will significantly shorten the journey from Mumbai to Jawaharlal Nehru Port (JNP), by 20 minutes which makes your total journey 30 – 40 minutes. The new boat also prioritizes passage comfort with air-conditioned seating arrangements, improving the travel experience once launched in January 2025.

These fast and efficient ferry Boats can comfortably accommodate 20 – 24 passengers at a time, offering a seamless travelling experience with an easy online ticketing system and check-in options. Tickets will continue to be issued by JNPA. Operating from the Gateway of India to Jawaharlal Nehru Port in the sea, and from the Bhaucha Dakka to Jawaharlal Nehru Port during the foul season, these ferry Boats promise to make commuting more convenient and hassle-free for travellers. Seamlessly connecting Jawaharlal Nehru Port to Mumbai, making transportation more convenient for everyone.

This new initiative makes a significant step towards sustainable and efficient transportation, offering a faster, eco-friendly and more comfortable travel experience for passengers to and from JNPA.

Specifications of Zero Emission Boat:

Particulars  Specifications
Passenger Capacity (During Fair and Foul Season)Passenger capacity during Fair Season: 20-25 Foul Season: 10-12 Two Boats at a time shall be made available to meet the requirement of 40 pax per schedule.
Speed of launch10 Knots cruising,  12 Knots Max Speed.
Length of Launch 12 – 15 Meters.
Material of Launch Fiber Reinforced Polymer.
Draft of LaunchNot more than 1.5 m loaded.
Freeboard1 to 1.5 Meter.
No. of tripsIt will be decided by Port as per requirement.
Endurance Time (Operational Time)       At least three hours on a single charge.
Charging TimeWithin 75 Minutes (Max.)
Share This News Story: